AgentArmies reports
The parent orchestrator's HTML reports for Joel, newest first. Files live in state/reports/ of the orchestrator repo as YYYY-MM-DD-HHMM-slug.html (UTC); this page is regenerated by just reports. 7 reports.
2026-09-03
| time | report | what it covers | size |
|---|---|---|---|
| 14:25 UTC | org-ops-7 → org-ops-8: the ops handoff (2026-09-03 14:25 UTC) org-ops-7-handoff | org-ops-7's handoff to org-ops-8: the thirty-minute cycle and the one-timer rule, the paged red sweep that replaced a truncating one, PLAT-62 merged and the legal-status ruleset armed and proven, orchestrator#27's merge path and pre-check, the burn figures and why the band became two numbers, PLAT-50, the demos publisher's trigger gap and what a page key does not mean, the open asks to platform, and the API-shape mistakes that cost three wrong reports. | 22 KB |
| 14:06 UTC | t3code fork feedback from the AgentArmies orchestrator, 2026-09-03 t3code-fork-feedback | Ten observed behaviours of the t3code fork that cost the fleet time on 2026-09-02 and 2026-09-03, each with the observation, its impact and the ask, for the fork's developer. | 11 KB |
| 09:02 UTC | org-ops-6 → org-ops-7: the ops handoff (2026-09-03 09:02 UTC) org-ops-6-handoff | org-ops-6's handoff to org-ops-7: the thirty-minute cycle and its order, the Actions budget band and its samples, the nodes' three tells, the conventions settled for demo rows, the helper and shim verifications, the open observations, the verification habits, the stop file and the PLAT-62 line. | 10 KB |
2026-09-02
| time | report | what it covers | size |
|---|---|---|---|
| 21:30 UTC | Daily demos, 2026-09-02 daily-demos | Joel's daily page of live URLs, one per part of the project: what to open, what to look at, how fresh it is, and what is dead or still pending. | 26 KB |
| 18:05 UTC | Roadmap, re-cut: any coordinate on Earth by default roadmap-okrs-any-coordinate | The roadmap re-cut on Joel's word that everything is ground floor for any coordinate on Earth by default: Austin is judged first, never the scope. Six objectives, thirty dated milestones by owner on one timeline, the dependency chain, and what Joel decides (INB-12, the MVP date). Supersedes the 17:50 report. | 28 KB |
| 17:50 UTC | Roadmap: objectives, key results and dated milestones roadmap-okrs | Superseded at 18:05 UTC by the any-coordinate re-cut. The org's first roadmap: six objectives with measurable key results to the friends-and-family link, twenty-nine dated milestones by owner on one timeline, the dependency chain from contracts to the client, and what Joel decides (INB-12, the MVP date). | 27 KB |
| 14:50 UTC | End states, contracts and plans end-states-contracts-plans | Every repo's end state and its review status, the eight contracts and who owns v0, the tier A plans and how much review changed them, the five labs, every open PR, the fleet after the capacity course change, and the ramp plan from the pause. | 42 KB |